    The warehouse's inventory is newly displayed, and it is available from stock. LONGI/Jinko/JA and other Tier 1 solar panels, Deye inverters, and Growatt 5000ES off-grid inverters are all available in stock. You are welcome to place an order at any time, and it can be shipped immediately. SUNROVER professional sales team at your service.  
  • LONGI solar panel is on sale! Ready to ship!
    LONGI solar panel is on sale! Ready to ship!
    May 09, 2022
    LONGI solar panel is on sale! Ready to ship! The next batch will arrive in 10 days, contact me booking earlier than your competitor. A professional team will serve you, support sea/air/express, etc.
  • Deye hybrid inverter Fresh Arrival! shipping soon!
    Deye hybrid inverter Fresh Arrival! shipping soon!
    May 05, 2022
    Deye hybrid inverter single-phase inverter 5KW/8KW, three-phase inverter 12KW are all delivered, and will be shipped to Czech/Lebanon/Poland and other countries, and there will be Deye hybrid inverter and Tier1 solar panel, as well as our own The brand SUNROVER solar panel will be delivered to our warehouse one after another, and photos and videos will be taken at that time.
  • The 50.49KW solar power generation project of the university teaching building was completed!
    The 50.49KW solar power generation project of the university teaching building was completed!
    March 16, 2022
    The 50.49KW on grid system solar power generation project of the experimental training building of Anhui Jianshe University's South Campus in Hefei City, Anhui Province, China was successfully on grid.
  • Guangxi Huadian Liuzhou Liudong New Area Phase II 15MW distributed solar power generation project was successfully connected to the grid.
    Guangxi Huadian Liuzhou Liudong New Area Phase II 15MW distributed solar power generation project was successfully connected to the grid.
    March 08, 2022
    Guangxi Huadian Liuzhou Liudong New Area Phase II 15MW distributed solar energy system project was successfully connected to the state Grid on March 4. The solar panels of this project are all LONGI 540W Monocrystalline solar panels, and the inverters are HUAWEI 196KW on grid  inverters.  The total scale of the project is planned to be 15MW, and a total of 10 solar roofs will be constructed. After the project is completed, it is expected that the average annual solar energy system will be 14 million kwh, and the carbon dioxide emission will be reduced by about 13,000 tons.
  • On-grid Solar system PV roof project 1.78MW completed perfectly!
    On-grid Solar system PV roof project 1.78MW completed perfectly!
    February 24, 2022
    The construction of the On-grid Solar system 1.78MW photovoltaic roof project is completed! The project factory is located in Hefei City, Anhui Province, China. All use JA 540W solar panels, two pitched roofs and flat roofs, with different bracket designs.
  • The roof 1.78MW photovoltaic power station project of Yutong Printing Factory in Hefei City, Anhui Province, China is under construction.
    The roof 1.78MW photovoltaic power station project of Yutong Printing Factory in Hefei City, Anhui Province, China is under construction.
    December 09, 2021
    SUNROVER POWER CO., LTD is under construction at the 1.78MW rooftop photovoltaic power station project of Yutong Printing Plant in Hefei, Anhui, China. The project has two roofs with a total capacity of 1.78MW, saving electricity fee income of ¥5363949.85 (approximately $841603.73), and an average annual income of ¥214557.99 (approximately $33664.15). It saves about 17,879.83 tons of coal and reduces about 39,390.27 tons of carbon dioxide emissions. Using JA 540W solar panel/photovoltaic modules, the color steel tile roof is installed with angle-chilling fixtures, and the concrete roof is installed with steel brackets on concrete piers to achieve wind resistance.
  • The second phase of the 15MW distributed photovoltaic power generation project in Liudong New District, Huadian Liuzhou, Guangxi, China started successfully!
    The second phase of the 15MW distributed photovoltaic power generation project in Liudong New District, Huadian Liuzhou, Guangxi, China started successfully!
    December 28, 2021
    The second phase of the 15MW distributed photovoltaic power generation project in Liudong New District, Huadian Liuzhou, Guangxi, China started successfully! The second phase of the photovoltaic project in Liudong New District, located in Liuzhou City, Guangxi Province, China, started smoothly, with a total capacity of 15MW and using LONGI 540W photovoltaic modules.