On July 1, PetroChina's first water surface solar system project, the Daqing Oilfield Spark Water Surface solar system Demonstration Project, was connected to the grid for power generation, which marked the overall acceleration of the integration of Daqing Oilfield's new energy business into the main business.
Daqing Oilfield vigorously cultivates new energy and new forms of business, and strives to build a green industrial structure and a low-carbon energy supply system. During the "14th Five-Year Plan" period, it strives to build a green and low-carbon sustainable development demonstration base with a new energy installed capacity of more than 2 million kilowatts. The replacement rate of clean energy is more than 20%.
According to Wang Jun, manager of the strategic development department of CNPC, the project uses two water surfaces, with a construction land of 400,000 square meters and an installed capacity of 18.73 megawatts. It only took more than 4 months from the completion of the project to the completion of the project, and the efficient and on-time production was realized.
Daqing Oilfield Spark Water Surface Photovoltaic Demonstration Project, as the first water surface solar panel project of PetroChina, has completed the successful exploration of independent design and construction of water surface photovoltaics. The successful commissioning of this project indicates that Daqing Oilfield is implementing the national "dual carbon" goal and the group company's green low In the journey of carbon development, a key step has been taken. This provides a solid technical reserve and beneficial construction experience for the subsequent development of various new solar energy project, and plays a positive role in stimulating and promoting the vigorous development of new energy business in oilfields.